5 min video with captions · one-page job aid · short quiz
Job aid
DOWNTIME: the eight wastes
What it is: Waste is anything that uses time, effort or money but adds nothing the customer values. Lean groups waste into eight types, remembered as DOWNTIME.
Letter
Waste
What it looks like
D
Defects
Work that has to be corrected or redone
O
Overproduction
Making more than needed, or before it's needed
W
Waiting
Work can't move because something isn't ready
N
Non-utilized talent
People's skills and ideas going unused
T
Transportation
Moving materials or information more than necessary
I
Inventory
More stock or queued work than the process needs
M
Motion
Walking, reaching or searching more than the job requires
E
Extra-processing
More work than the customer needs
How to use it
Watch out for
1. Walk the process where the work happens. 2. Spot anything that adds no value. 3. Name it with DOWNTIME. 4. Estimate its cost: time × people × frequency. 5. Pick the biggest one to tackle first.
• Calling required checks waste. Safety inspections and controls stay: make them easier, never skip them. • Blaming people. Waste comes from the process, not from individuals. • Mixing up motion (people moving) and transportation (things moving).
Estimate: time lost each time × people affected × how often = cost per day or shift.
Examples
Industry
Example
✈ Airline MRO
On a night-shift hangar check, technicians wait about 2.5 h a shift for parts from stores: 2.5 h × 8 technicians × 3 shifts = 60 h a day → Waiting.
🚚 Logistics
At a cross-dock, about a third of pallets are set down in a buffer zone before they reach the outbound dock door, with nothing done to them → Transportation.
✚ Healthcare
In the emergency department, patients are asked about allergies at registration, at triage and again at assessment: one answer, recorded three times → Extra-processing.
All examples are fictional.
Quiz
Answer each question first; the answer and why open after you choose or press “Show the answer”. Nothing is saved or sent.
Pass mark: 75% (3 of 4)
Q1 · Airline MRO · Industry question
Scenario: During a fictional overnight hangar check, a technician removes a worn seal and raises a request to stores for a replacement. While the part is being picked, the technician stays by the aircraft for 40 minutes, unable to continue the task card.
Question: Which waste best describes the technician's 40 minutes?
Answer: B
Why:
A) Motion is unnecessary movement by people. The technician isn't moving; they're idle.
B) ✓ Waiting is time when work can't move forward because something isn't ready, here the part.
C) Inventory is too much stock. The problem is a part that isn't there yet.
D) Transportation is moving materials more than necessary. The part's trip from stores isn't the waste being described.
Q2 · Logistics · Industry question
Scenario: At a fictional cross-dock, about a third of inbound pallets are set down in a buffer zone, then picked up again and taken to the outbound dock door. Nothing is done to them in the buffer zone.
Question: Which waste does the extra move through the buffer zone represent?
Answer: A
Why:
A) ✓ Transportation is moving materials more than necessary. Each pallet takes an extra trip with nothing added.
B) Overproduction is making more than needed, or before it's needed. Nothing extra is made.
C) Motion is about people walking, reaching or searching, not the movement of the goods.
D) Extra-processing is doing more work on the item than the customer needs. Nothing is done to the pallet.
Q3 · Healthcare · Industry question
Scenario: On a fictional medical ward, nurses walk to a supply room at the far end of the corridor about 24 times a shift. Each round trip takes about 3 minutes, and 4 nurses work each shift.
Question: About how much nursing time does the walking cost each shift?
Answer: D
Why:
A) 3 min × 4 nurses counts one trip each. The trips happen 24 times a shift.
B) 24 trips × 3 min = 72 min is right for one nurse, but 4 nurses make the trips.
C) 24 trips × 4 nurses = 96 counts trips, not minutes. Each trip takes 3 minutes.
D) ✓ 24 trips × 3 min × 4 nurses = 288 minutes, about 4.8 hours of nursing time a shift.
Q4 · Manufacturing · Transfer question
Scenario: A fictional machining area makes a full week of one part in a single run to avoid changeovers (the time it takes to reset a machine for a different part). This week it has made 4,000 shafts, but the only customer order is for 600.
Question: Which waste is the root of the problem described?
Answer: C
Why:
A) The 3,400 extra shafts do become inventory, but that's the result. The cause is making them in the first place.
B) Nothing in the scenario is held up waiting for something else.
C) ✓ Overproduction is making more than needed, or before it's needed: 4,000 made for an order of 600.
D) Defects are errors that need correcting. Nothing here says the shafts are faulty.
Why this transfers: manufacturing isn't in the M2 video, and overproduction isn't shown in the video's examples. The one industry term (changeover) is explained in the scenario, so a learner who understands overproduction can answer without knowing machining.
All examples are fictional.
Cookies on InLine Ops. We'd like to use optional analytics cookies to see how the site is used and improve it. They're only set if you accept. Read more about cookies
ACADEMY · IN PRODUCTION
The Academy opens soon
We use your email only to tell you about this. See our Privacy Policy.