ACADEMY · FREE MODULE 2 OF 11

M2 · The 8 Wastes

5 min video with captions · one-page job aid · short quiz

Job aid

DOWNTIME: the eight wastes

What it is: Waste is anything that uses time, effort or money but adds nothing the customer values. Lean groups waste into eight types, remembered as DOWNTIME.

Letter Waste What it looks like
D Defects Work that has to be corrected or redone
O Overproduction Making more than needed, or before it's needed
W Waiting Work can't move because something isn't ready
N Non-utilized talent People's skills and ideas going unused
T Transportation Moving materials or information more than necessary
I Inventory More stock or queued work than the process needs
M Motion Walking, reaching or searching more than the job requires
E Extra-processing More work than the customer needs
How to use it Watch out for
1. Walk the process where the work happens.
2. Spot anything that adds no value.
3. Name it with DOWNTIME.
4. Estimate its cost: time × people × frequency.
5. Pick the biggest one to tackle first.
• Calling required checks waste. Safety inspections and controls stay: make them easier, never skip them.
• Blaming people. Waste comes from the process, not from individuals.
• Mixing up motion (people moving) and transportation (things moving).

Estimate: time lost each time × people affected × how often = cost per day or shift.

Examples

Industry Example
✈ Airline MRO On a night-shift hangar check, technicians wait about 2.5 h a shift for parts from stores: 2.5 h × 8 technicians × 3 shifts = 60 h a day → Waiting.
🚚 Logistics At a cross-dock, about a third of pallets are set down in a buffer zone before they reach the outbound dock door, with nothing done to them → Transportation.
✚ Healthcare In the emergency department, patients are asked about allergies at registration, at triage and again at assessment: one answer, recorded three times → Extra-processing.

All examples are fictional.

Quiz

Answer each question first; the answer and why open after you choose or press “Show the answer”. Nothing is saved or sent.

Pass mark: 75% (3 of 4)

Q1 · Airline MRO · Industry question

Scenario: During a fictional overnight hangar check, a technician removes a worn seal and raises a request to stores for a replacement. While the part is being picked, the technician stays by the aircraft for 40 minutes, unable to continue the task card.

Question: Which waste best describes the technician's 40 minutes?

Q2 · Logistics · Industry question

Scenario: At a fictional cross-dock, about a third of inbound pallets are set down in a buffer zone, then picked up again and taken to the outbound dock door. Nothing is done to them in the buffer zone.

Question: Which waste does the extra move through the buffer zone represent?

Q3 · Healthcare · Industry question

Scenario: On a fictional medical ward, nurses walk to a supply room at the far end of the corridor about 24 times a shift. Each round trip takes about 3 minutes, and 4 nurses work each shift.

Question: About how much nursing time does the walking cost each shift?

Q4 · Manufacturing · Transfer question

Scenario: A fictional machining area makes a full week of one part in a single run to avoid changeovers (the time it takes to reset a machine for a different part). This week it has made 4,000 shafts, but the only customer order is for 600.

Question: Which waste is the root of the problem described?

All examples are fictional.