ACADEMY · FREE MODULE 11 OF 11

M11 · Sustaining Gains

7 min video with captions · one-page job aid · short quiz

Job aid

Keep the improvement in place

Improvements rarely fail on day one. They fade later, quietly, once nobody is watching. Sustaining a gain means building the watching in.

1 Control plan (3–4 metrics)

Metric Target and range How often Owner Reaction: trigger → first action Escalation
One measure of the gain e.g. ≤ 9 h Every check · daily · weekly One named role "Over 10 h twice in a week → raise at tier 2" Who, by when

Checks: every metric has one owner · every reaction is an action ("Review late items at tomorrow's huddle"), never "monitor" or "investigate".

2 Tiered huddle

Item Design
Tier 1 At the work, standing, 10–15 min, same time daily
Board Metrics · problems · actions
Agenda Yesterday's numbers → problems → actions with owners
Escalation What tier 1 can't solve goes to tier 2 the same morning
Tone Problems, not people

3 Leader standard work: a fixed route at fixed times; check the board against the floor; ask "What got in your way today?"

Four reasons gains slide back

Reason Early warning Countermeasure
1 Nobody watches Board not updated; huddles skipped Huddle plus the leader's check
2 New people Newcomers do the old steps Teach the standard in onboarding
3 System or form change A step quietly disappears after an upgrade Protect the step in change management
4 Old way still easier People drift back to the shortcut Remove the old way, or make the new way the easy way

Watch out for: too many metrics · reactions that say "investigate" · huddles that turn into reporting meetings · moving the project team on before the routine is running.

Examples

Industry Control plan (excerpt) Daily check Reason and countermeasure
✈ Airline MRO A-check TAT, every check, shift lead: escalate if > 10 h twice a week Tier 1 07:00 (10 min) → tier 2 08:30 Nobody watches in busy weeks → tier 2 asks "was tier 1 held?"; manager's check at 07:15
🏦 Banking/Services Pend rate, daily, team lead: check the checklist is in use if over 10% Huddle 09:15 (15 min) · weekly ops review System upgrade removed a field → protected in change management
📦 Logistics Dock-to-stock, daily, inbound lead: review trailers over 10 h at the next huddle Dock walks 10:00 and 15:00 New temporary staff → 15-min visual onboarding
⚙ Manufacturing Scrap per shift: quality engineer reviews if over 2% for 2 shifts in a row 10-min start-of-shift huddle (supplemental example)
✚ Healthcare Falls, late doses, discharges before noon: any red metric goes up Ward huddle 08:30 → matron's huddle 09:30 (supplemental example)

All examples are fictional.

Quiz

Answer each question first; the answer and why open after you choose or press “Show the answer”. Nothing is saved or sent.

Pass mark: 5 of 6, and Q6 needs all 3 reasons with matching countermeasures. Q5 counts as correct at 5 of 6 rubric points.

Q1 · Airline MRO · Where it's raised

Scenario: A fictional hangar holds a tier-1 huddle at 07:00 at the hangar board (10 minutes) and a tier-2 meeting at 08:30 with the base managers. This week, two A-checks run over 10 hours, which the control plan says must be escalated.

Question: Where is it raised first, and what happens if tier 1 can't solve it?

Q2 · Banking/Services · A complete control-plan row

Scenario: A fictional lender's team is writing its control plan for the pend rate (the share of loan applications put on hold for missing information).

Question: Which row is complete?

Q3 · Logistics · The right countermeasure

Scenario: At a fictional distribution center, dock-to-stock (the time from a trailer being unloaded to goods ready for picking) creeps over 10 hours in the first peak week. Many new temporary staff have just started, and they check and label in two separate steps.

Question: Which countermeasure fits the reason?

Q4 · Manufacturing · Transfer question

Scenario: After a scrap project, a fictional bracket line (metal brackets bent and welded) tracks scrap per shift on a board, discussed at a 10-minute start-of-shift huddle. The control plan says: if scrap is over 2% for 2 shifts in a row, the quality engineer reviews it.

Question: Scrap has been over 2% for two shifts. What happens, and why is a fixed trigger better than "keep an eye on it"?

Q5 · Build exercise (learner's choice)

Task: For a process you've improved, or for this one: an IT service desk cut first-response time from 4 hours to 1 hour. Write a control plan with three metrics, and design a daily huddle or a leader's walk to check it.

Q6 · Written answer

Task: Name three reasons improvements fail to stick, and a countermeasure for each.

All examples are fictional.